System Testing

 
System testing should be conducted in at least two ways:
Using DiagnostyX  - which does not use any database nor require or rely on software configuration
  • To verify communication with the Controller
  • Set programmable parameters for each device as necessary for the installation
  • Test each door for changes of state (open/close)
  • Verify door, gates and other relay controlled devices work properly.
     
     
    Using Axcys
  • To verify communication with the Controller and is recognized by the Security Software
  • Verify that programmable parameters, for each device as necessary for the installation, work as intended
  • Test each door for changes of state (open/close) and show proper unit ID.
  • Verify door, gates and other relay controlled devices work properly.
     
     
    Perform an output from the customers Property Management System.  Following this, carefully verify that the unit id's from the PMS are the same as what was originally intended, and match imported unit ids (if the facility has existing units, or is using a unit alarm system - which would be part of these tests).